Not only do we take care of all of the architectural designs and planning permissions with local authorities, but we also use the best material and resources to ensure the durability of your industrial build, while adding our aesthetic touch to your interior design.
“It is not the beauty of the building you should look at:
it’s the construction of the foundation that will stand the test of time.”
Autodeushe, Camden Town – Demolish of existing petrol service station and construction of a newly built garage on a steel frame, which was built over a live railway bridge with floating light weigh ball foundation, and curtain walling system to the façade. This construction was completed in 40 weeks.
London Road, Westcliff On Sea – Demolition of the existing car showroom and construction of 18 new dental surgery, compromising of 8 flats constructed on piles and ground beams, steel frame structure over 3 floors. This construction is scheduled to completion by August 2021 (52 weeks, impacted by COVID-19)